Parallel pre-insulated P-branches are installed where a branch is required off the district heating main. The branch may have the same or a different diameter and uses a 90° branch bend.
The steel fittings used to manufacture pre-insulated T-branches meet the manufacturing and supply requirements of EN 10253-2.
The branch connection to the run pipe is calculated in accordance with Annex A of EN 13941 to determine whether reinforcement is required.
Pre-insulated T-branches meet the same quality requirements as straight pre-insulated pipes.